Total Floor Area: 172 sq.m.

Completion: 34 days Uneven outdoor flooring causes the water to settle Re-construct the existing floor using reinforced steel bars along with cement, sand and water, have a slope towards the drainage. Add some stones and grooves for design. Never leave the plants running around, provide plant box.